Return to the New Vashon Island High School

the New Vashon Island High School:
Construction site 09/04/2012

Please return to
the New Vashon Island High School
home page for construction site photos from other dates

the New Vashon Island High School: Construction site 09/04/2012

Go to the top

9361_new_VHS_construction_090412

The little conversation circle on the way over to the gym that no one pays any attention to...

8313_new_VHS_construction_090412

The foundation locations for the Music Room are spray-painted onto the ground. Next, excavation, build the forms, pour concrete.

8320_new_VHS_construction_090412

Looking across from the corner of the B building toward the Stadium.

8356_new_VHS_construction_090412

The lovely view coming out of the A building.   o__O

8378_new_VHS_construction_090412

The gravel driveway/walkway along the back of the grandstand is now the formal route between the high school and McMurray/Chautauqua.

8396_new_VHS_construction_090412

Looking across the Vashon High School campus. This will be all building, certainly in a year.

the New Vashon Island High School: Construction site 09/04/2012


Return to the New Vashon Island High School

the New Vashon Island High School:
Construction site 09/04/2012

Please return to
the New Vashon Island High School
home page for construction site photos from other dates


Canon EOS 1D Mark IV Digital Imaging!

Canon EOS 1D Mark IV digital imaging

All my digital photography
copyright John D Sage/FinchHaven™
1999, 2000, 2001, 2002, 2003, 2004, 2005, 2006, 2007, 2008, 2009, 2010, 2011, 2012 etc etc...

Valid HTML 4.01 Transitional

This page preened using gedit 3.4.1 at www.FinchHaven.com by Webmaster


Last modified: Saturday 05/13/2023 10:27:46 PDT for https and edits

Go to the top